Image
vector-logo
19 August 2024

Start of Perimeter Piling Works on the Site

A key stage has begun at the Buddha Club House construction site — the installation of perimeter piles. This work is essential to prevent soil displacement and structural deformation, particularly in the context of dense urban development.

Preparatory Works at Buddha Project (2)

The piling serves several important purposes:

  • protecting neighboring buildings from possible ground shifts and damage during excavation and foundation work,

  • reinforcing the edges of the excavation site,

  • stabilizing the soil around the perimeter,

  • preparing the ground for the upcoming foundation stage.

The work is being carried out by SATRIA, a specialized construction company with strong expertise in preparatory and engineering solutions. Thanks to their professional approach, the project is progressing on schedule and in full compliance with safety regulations.

 2024  2 (1)

Buddha Club House is located in the prestigious Berawa district of Canggu — combining modern engineering, thoughtful architecture, and attention to every detail. Stay tuned as foundation works will begin soon.